Drywall Contractors in Greenville: Installation, repairs, ceilings and texture matched to the wall around it

Four crews working across the Upstate, most jobs starting inside two to three weeks, and every coat given the days a Carolina summer actually needs.

Drywall Contractors in Greenville, SC

Light across a wall finds nothing to catch on, and the drywall in your Greenville house still reads flat after the first summer.

One close, square view of a taping knife drawing compound down a butt joint, the blade loaded and the joint half filled

Greenville Drywall Elite is a drywall contractor in Greenville, trading since 2013 and running four crews across Greer, Simpsonville, Taylors and the towns between them. New jobs go in the book two to three weeks out.

Drywall installation is the bulk of it, whole houses and additions boarded from bare framing. Under that sit drywall repair, texture and finishing with knockdown matched off a test board, ceilings taken back from popcorn and skimmed flat, and water damage repair that starts with a meter.

Every surface is finished to a level named on the GA-214 scale before the first coat goes on, so a hallway does not show every joint by four in the afternoon.

Is a single patched corner enough drywall work to book a crew for? The smallest drywall job here is one doorway corner a mover clipped, phoned in by a homeowner, and the largest is a forty unit building hung to a general contractor's turnover date.

Call Greenville Drywall Elite at (864) 555-0119 for a free drywall measure in Greenville, Greer, Simpsonville or Taylors. Somebody comes out, measures the board and what is behind it, and leaves you holding an itemized quote.

What we hang, tape, texture and repair in Greenville

  • Drywall Installation
  • New Build Boarding
  • Garage and Basement Finishing
  • Insulation and Soundproofing
  • Drywall Repair
  • Patching and Skimming
  • Nail Pop and Crack Repair
  • Taping and Mudding
  • Texture Matching
  • Skim Coating and Level 5 Finish
  • Ceilings and Soffits
  • Popcorn Ceiling Removal
  • Ceiling Repair and Replacement
  • Water Damage Repair
  • Ceiling Leak Repair
  • Mold Damaged Board Replacement
Wes and Carolyn Tolbert standing side by side in black work shirts against a plain gray backdrop, both smiling at the camera
Greenville Drywall Elite monogram Wes and Carolyn Tolbert Founders and owners

Who we are

Who is on your job from the measure to the last sand

We have hung and finished board across Greenville and the Upstate since 2013, four crews out of one yard. Thirteen years on, the job still comes down to the finish level agreed in writing and the days a coat needs.

The visit and the measure cost nothing, and the quote comes back itemized so you can see what each line buys. We put a light in the crawl space before blaming a stain on the wall, and we time coats to the weather.

Why trust us

  • Board order, hanging, tape, coats and sanding on one contract
  • Since 2013, four crews and about two hundred and twenty jobs a year
  • You never book the tear-out, the hauling or the cleanup yourself

Services

Drywall services across Greenville and the Upstate

  • A bedroom in an addition with the board just hung and the first coat of compound on the joints, one wall still showing screw lines

    Drywall Installation

    For anybody who has framing standing and nothing on it yet. Builders come here with a spec house and a closing date, and homeowners come here with an attic, a garage or an addition that has reached the point where it needs walls. What people pick it for is the part before the board goes up, which is the string line across the studs and an honest answer about whether the lumber is dry enough to cover.

    Learn more about Drywall Installation
  • A living room wall with a finished repair in the middle of it, primed and blending into the older painted surface either side

    Drywall Repair

    For anybody looking at damage they have stopped seeing and a buyer would notice immediately. Landlords call between tenants, homeowners call the week before family arrive, and people call after a mover has clipped a corner. What makes people pick it is the texture matching, because that is the part that decides whether a repair reads as a repair or as a wall.

    Learn more about Drywall Repair
  • A living room wall part way through a knockdown texture, one half sprayed and drawn flat and the other half still smooth primer

    Texture and Finishing

    For anybody looking at a wall where one patch of texture does not match the rest, and for anybody tired of knockdown in every room. Plumbers leave a stripe of fresh mud behind them, builders need a new house to match the four either side, and owners of nineties houses want the walls flat. What people pick it for is the test board, sprayed and drawn in front of you before anything goes near your wall.

    Learn more about Texture and Finishing
  • A finished bedroom ceiling seen from below, smooth and primed with no joint lines in it

    Ceilings

    For anybody who has stopped looking up. Owners of 1960s and 1970s ranches call when the popcorn has to go before a house is listed, and landlords call when a ceiling has started to bow between the joists over somebody's bed. What people pick it for is the mess, or rather the handling of it. The room is sealed, the texture comes off wet instead of as dust, and the waste is bagged and gone the same day.

    Learn more about Ceilings
  • A bedroom wall and ceiling corner put back after a leak, primed and blending into the older painted surface around it

    Water Damage Repair

    For anybody standing under a stain that was not there last week, and for anybody with a wall that gives under a thumb. Homeowners call the morning after a storm, and landlords call when a tenant reports a bulge under a bathroom. What people pick it for is the meter. The wall goes back on two readings a day apart rather than on somebody's opinion that it feels dry, and the numbers come to you in writing.

    Learn more about Water Damage Repair

The board that goes up in a house over a crawl space

Half inch on walls, five eighths on ceilings, Type X where code calls for it, mold resistant board in every bath.

Walls take half inch board and ceilings take five eighths, because half inch sags between joists at twenty four inch centers and that sag shows as a wave the first time somebody puts a lamp under it.

Type X goes on any garage ceiling with living space above and on the party wall of an attached unit. Every bathroom and laundry gets mold resistant board, not because code always demands it but because a Greenville bath sits above eighty percent humidity for months.

Flat seams are taped in paper rather than mesh, which is stronger across a joint and will not telegraph a crack. Outside corners take metal bead, bedded and screwed, so it does not pop when green framing moves through its first summer.

A cut edge of half inch board stood against a stack of five eighths sheets, close enough that the paper facing and the gypsum core are both readable
A run of metal corner bead on an outside corner, bedded in compound and screwed off
  • Half inch board on walls
  • Five eighths on every ceiling
  • Type X where code calls for it
  • Mold resistant board in wet rooms
  • Paper tape on all flat seams
  • Metal corner bead, bedded and screwed

Ask the other two quotes which board is going on your ceilings, then call and we will tell you ours.

(864) 555-0119

Three things about the Upstate that change a drywall job

Compound gives up its water slowly in a Carolina July, the damp comes from a crawl space rather than a basement, and mill houses move. Three things that change the job.

Compound dries on the weather's schedule
From June to September the air here sits near saturation, so a coat that closes overnight in March can want two full days. We run fans and a dehumidifier rather than sand a coat that is still green, which is what shrinks a joint back in October.
The damp comes from underneath
Most houses here sit over a crawl space rather than a basement, so moisture arrives at the bottom of a wall instead of through one. A stained base course points at a torn vapor barrier or a blocked vent, and hanging over it buys a year at most.
Mill houses were framed in green lumber
The 1920s stock in North Main, Overbrook and the West End was framed with lumber that has been drying for a century, so studs bow and ceilings run out of level. Board fixed straight onto it telegraphs every hump, so the framing gets shimmed first.

What Upstate customers said after the crew left

  • Rated 5 out of 5

    Screw pops all over the upstairs of a 2022 build. They pulled the board back where the framing had moved rather than just filling them. None have come back.
    Curtis B. Greer Drywall Repair
  • Rated 5 out of 5

    Garage into an office, and the boarding was the part I dreaded. August air meant the coats wanted two extra days, and they told me that on day one rather than at the end. It reads like a real room now.
    Alicia N. Fountain Inn Drywall Installation
  • Rated 5 out of 5

    The house is from 1986 and every ceiling had popcorn. My realtor said leave it alone. Wes put a light up there and showed me the ripples underneath, so we did the den first to see. Flat now.
    Bonnie H. Mauldin Ceilings

Reviews are easy to write and hard to check, so ask us for a finished job near you and go and look at it.

Get a free quote

Rooms we have finished from Taylors to Travelers Rest

Six jobs finished in the last year, each one in a town the crews actually drive to. The constraint is named on every card, because that is the part that made the job what it was.

Waiting on a wall before the painter comes?

A free measure at the house, and a finish level named in the quote.

Get a free quote

What moves the price on a drywall quote?

Two rooms of the same size can quote a long way apart. What separates them is what sits behind the old surface and how good the finish has to be, and neither is visible from a doorway.

Board area, not room count
Quoting runs off the square footage of board and the number of cuts around windows, doors and returns. A small room chopped up by openings can carry more board work in it than a large plain one.
Level of finish
A garage getting one coat of paint stops at Level 3. A hallway with a window throwing light down it wants Level 5, which is a skim over the whole face and roughly another day of sanding per room.
Ceiling height and access
Anything above a comfortable reach means staging, two pairs of hands on every sheet and slower taping overhead. Stairwells and vaulted rooms cost far more in labor than they ever do in board.
What is behind the old surface
Until a sheet comes off, nobody knows whether the framing is straight, whether old wiring is stapled across it or whether the insulation is wet. Anything found there is priced when it is found.
Humidity and drying days
Compound gives its water up to the air, and from June the air here is already carrying all it can hold. A job that closes in four days in March can want six in August unless fans and a dehumidifier run.
Texture matching
Matching an existing knockdown or orange peel across a patch is slower than texturing a bare wall, because the gun has to be tuned to a setting somebody else chose thirty years ago.

Which of these actually apply to your job gets settled on the visit rather than on the phone, and it is written down before anybody starts. Get a free quote

How drywall work affects your home's value

Drywall is the one thing a buyer sees in every room and never once thinks about when it is right.

No published remodeling study prices drywall as a line item. The Cost vs Value report from Remodeling magazine measures whole projects, and the board and tape inside a South Atlantic bath remodel is buried in the project figure. Anybody quoting a percentage return on drywall has made it up.

What holds value is decided by you rather than by the market. A finish level agreed in writing, mold resistant board in the wet rooms, and a crawl space problem fixed before the wall goes back are the three that still look right five years out. A skim coat over a wet stud bay is not, and it is the first place a buyer's inspector puts a moisture meter.

A finished, furnished bonus room over a garage, painted and lived in, with a sofa, a lamp and a rug

From your first call to a room that is ready for paint

Three to seven days on site for most rooms, and the dusty half of it is done inside the first two.

  1. You call and describe it

    Same day callback

    Tell us the room, roughly how big it is and what went wrong. A photograph from your phone saves a visit's worth of guessing, and you get a straight answer about whether the job is a morning or a week.

  2. A measure at the house

    Within two working days

    We measure the board area, look at what is behind the old surface and put a light in the crawl space if damp is any part of the story. The visit costs nothing and nothing is left for you to work out afterwards.

  3. A written quote, itemized

    Next day, by email

    The quote names the board, the finish level and the number of days on site. Where two ways of doing it both make sense, both are priced, so you can see what the difference actually buys you.

  4. Board goes up and is taped

    One to three days

    Furniture is sheeted, doorways are zipped and floors are covered before anything is cut. Then the sheets go up, get screwed off and taped, and the first coat of compound goes on. This is the loud part.

  5. Coats, then sanding

    Two to four days

    Every coat has to be dry before the next one goes over it, and in a Carolina July that takes longer than the bag says. We build those days in rather than shut moisture under a finish.

  6. We clean up and take it away

    Half a day

    Scrap, sheeting and the bagged sanding waste leave with the crew. You get the room back swept and vacuumed and ready for primer, and somebody walks it with you before the van goes.

Tell us which room it is and somebody comes out and measures it, free, and puts the days on paper before you commit to anything.

Get a free quote

You hire one crew, not a diary of trades

Four crews have worked Greenville, Greer, Simpsonville and Taylors since 2013, and one of them takes a job from bare framing to a wall the painter can start on. The board order, the hanging, the tape, the coats and the sanding are all in the same contract. Each coat is given the days a Carolina summer actually needs rather than the days a schedule would like.

Call (864) 555-0119 or fill in the form for a free measure. The finish level, the coat count and what happens when the weather slows a coat are all written into the quote.

Get a free quote

A finished, furnished front room in an older house, walls painted and flat, afternoon light crossing them from a window.

Drywall service area

Where the crews go from the Upstate

Four crews run out of one yard in the Upstate, which puts most of it inside about twenty five minutes. Anything in that circle gets a measure visit the same week.

Primary service area

Greenville, SC

Greenville Drywall Elite 141 Traction St, Greenville, SC, 29611 (864) 555-0119

Also serving

  • Greer
  • Simpsonville
  • Mauldin
  • Taylors
  • Travelers Rest
  • Easley
  • Fountain Inn
  • Berea
  • Wade Hampton
  • Five Forks
  • Powdersville
  • North Main

If your town is not on this list it is probably still a short drive. Call and ask rather than assuming the answer is no.

Insured
General liability and workers compensation
Established
13 years
Callback
Same day

FAQs

Frequently asked questions

Questions people ask before a crew gets booked

Will you work on a house that still has plaster and lath?

Yes, and it is common in the older neighborhoods. Plaster over lath can be skimmed if it is sound, or stripped back and hung if it is drummy and letting go in sheets. We tap the whole wall first and tell you which of the two it is, because the answer changes the days on site more than it changes the material.

Do I need to be home while the crew is here?

Not for the whole job. Somebody needs to be there to let the crew in on the first morning and to walk the finished room at the end. In between, most customers leave a key or a code, and the crew works to the scope that was written down rather than asking questions through the day.

Will the sanding leave dust through the whole house?

Less than you are picturing, because the sanders run on vacuum hoses and the doorways get zipped in plastic. Fine dust still finds its way past that, so anything that cannot be moved out gets sheeted, and the room is vacuumed rather than swept at the end.

Do you paint the walls once the finishing is done?

We prime, and we stop there. A primer coat is part of the finish because it is what shows up any last flaw while the sander is still on site. Topcoat colors, trim and cutting in are a painter's work, and we will give you two names locally rather than pretend it is ours.

How long do I wait before painting new drywall?

Until the compound is dry all the way through, which in July here is usually three or four days after the last coat rather than the day after. Paint over compound that is still damp underneath and it flashes, meaning the joints show through the finish as dull stripes in raking light.

What happens if a joint cracks a year from now?

Call us and we come and look at it. Most first year cracks are the framing settling rather than the tape failing, and they are a cut, a re-tape and a texture match, which is half a day. What we do not do is argue about whose fault it is on the phone before anybody has seen it.

Is green board enough in a shower, or do I need cement board?

Green board is fine on the walls of a bathroom and it is not enough behind tile in a wet area. Anything inside a shower or a tub surround takes cement board or a foam backer, because moisture resistant paper still soaks eventually. We board the wet area in one and the rest of the room in the other.

Can I buy the board myself and just pay for the labor?

You can, and it usually costs you more than it saves. Board is bought by the pallet at trade rates and delivered by boom to the floor it is needed on, so a homeowner buying twenty sheets pays retail and then pays a crew to carry them upstairs. It also puts any defect in the sheets on you.

Where do you park, and how do sheets get into the house?

A truck and a trailer need about two car lengths on the street or the driveway for the delivery morning only, after which the trailer goes. Sheets come in through the widest door, and twelve footers sometimes come through a window opening on a new-construction house. We check both on the measure visit.

Do you handle insurance work after a leak?

Regularly. We write the scope in the format an adjuster expects, photograph what was behind the wall before it is covered, and give you moisture readings with dates on them. We work for you rather than for the carrier, so if the settlement is short of the real scope you will hear that from us.

Should I redo the whole ceiling or just the damaged part?

It depends almost entirely on the texture. A flat or a light orange peel ceiling patches invisibly, so there is no reason to touch the rest. Heavy knockdown from the eighties and nineties rarely matches across a seam, and on those the honest answer is often to skim the whole ceiling and retexture it.

Do you take out the old drywall, or do I?

We do, and the tear out is in the quote rather than added afterwards. Old board goes straight into the trailer as it comes off, which is why the demolition day is the day we ask for the parking. If you would rather strip it yourself to save the labor, say so before the quote is written.

Greenville Drywall Elite

The book runs two to three weeks ahead, so most rooms start inside the month.

Greenville Drywall Elite hangs, tapes, finishes and textures board across Greenville and the mill towns and new subdivisions around it, from crawl-space repairs to whole rooms hung from scratch. Four crews finish a little over two hundred and twenty jobs a year, residential and commercial alike. Trading here since 2013.

Why Greenville homeowners keep calling us back

  • Thirteen years hanging houses across the Upstate, trading since 2013
  • The measure is free and the quote is itemized, line by line
  • Damp is checked at the crawl space first, not guessed at from the stain on the wall
  • Coats are timed to Carolina drying days rather than rushed to meet a schedule
  • The room is swept and vacuumed before anybody calls the job finished

If a baseboard is stained from the crawl space, a ceiling needs drywall, or a room needs finishing from scratch, call (864) 555-0119 and somebody will come out and measure it for free. The quote is itemized so you can see what each part of the job costs, and the coats are timed to the weather rather than rushed.

(864) 555-0119

Give us a call

141 Traction St, Greenville, SC, 29611

Where to find us

Get an itemized quote

(864) 555-0119 Get a free quote